Rates

2010 Water Rates & Base Charge

Base Charge

Meter Size
$ Per Month
5/8" $14.45
3/4" $21.12
1" $34.51
1 1/2" $67.96
2" $108.11
3" $215.17
4" $335.61
6" $670.12
8" $1071.63
   

2010 Tap Fees & Water Acquisition Fees

Water Tap Fees

Meter Size
$ Tap Fee
   
3/4" $5,500
1" $13,750
1 1/2"   
$27,500
2" $44,000
3" $88,000
4" $137,500
6" $275,000
8" $440,000
   
 

Volume Charge

 
$ Per 1,000 Gal
Residential  
1st 5,000 Gallons $3.29
Over 5,000 Gallons $3.94
   
Commercial  
Uniform Rate $3.64
   
 

2010 Water Acquisition Fee

 Acquisition  Per SFE           $7,000
3/4"     = 1    SFE          
 1"       = 2.5 SFE
 
 1 1/5" = 5    SFE
 
 2"       = 8    SFE  
 3"       = 16  SFE
 
 4"       = 25  SFE
 
 6"       = 50  SFE
 
 

2010 Wastewater Rates & Base Charge

Meter Size
$ Per Month
5/8" $8.21
3/4" $11.61
1" $18.41
1 1/2" $35.44
2" $55.85
3" $110.28
4" $171.52
6" $341.64
8" $545.78
   
 

2010 Wastewater Tap Fees

Meter Size
$ Tap Fee
   
3/4" $5,500
1" $13,750
1 1/2" $27,500
2" $44,000
3" $88,000
4" $137,500
6" $275,000
8" $440,000
   
 

Volume Charge

 
$ Per 1,000 Gal
Residential  
Volume Charge $4.44
   
   
   
   
Commercial  
Volume Charge
Actual Monthly Usage
$4.44
   
 

Fees and Charges

Service Description Fee
Meter Installation, In-house 3/4" $361
Inspection Fee (each) $50
Hydrant Meter Deposit $500
New Service Deposit, Residential Water and Wastewater $100
New Service Deposit, Residential Wastewater Only $45
New Service Deposit, Commercial $150
Late Payment, Water and Wastewater or Wastewater only; $25
Returned Check Fee $25
Returned Check, Bank Fee $10
Service Charge, each (inspection, turn on, turn off, etc) $25
Tampering Fee $500
Tampering Fee, repair cost + administrative charge $Actual +
Grease Trap Clean-up $500